Author Topic: NV: I-580 bypass of Carson City now complete and open  (Read 3548 times)

0 Members and 1 Guest are viewing this topic.

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1524
  • Last Login:Today at 09:24:33 am
    • Hot Springs and Highways pages
NV: I-580 bypass of Carson City now complete and open
« on: August 04, 2017, 11:44:32 pm »
As discussed over at the AARoads forum, I-580 has been extended southwest about three miles, completing the eastern bypass of Carson City. The new segment opened two days ago, just after I returned to Sacramento. I clinched the new segment earlier today.

This extension is already shown in OSM/Mapnik. US 50 and US 395 have been rerouted onto the new segment, and the bypassed part of US 50/395 on Carson St. (but not Fairview Dr.) has been added to US 395 Business and apparently US 50 Business too. I say "apparently" since, while signage on I-580 confirms all the other route changes, I saw no mention of US 50 Business, which has long had iffy signage. I don't know if AASHTO's approval of all the other route changes included a change to US 50 Business.
« Last Edit: September 02, 2018, 11:56:40 am by michih »

Offline michih

  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 4555
  • Last Login:Yesterday at 04:04:16 pm
Re: NV: I-580 bypass of Carson City now complete and open
« Reply #1 on: October 20, 2017, 03:52:12 pm »
I saw commits to these files but I'm not sure if all issues mentioned are fixed. @oscar: Can the topic be marked solved?

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1524
  • Last Login:Today at 09:24:33 am
    • Hot Springs and Highways pages
Re: NV: I-580 bypass of Carson City now complete and open
« Reply #2 on: October 20, 2017, 07:28:05 pm »
The extensions/reroutes are mostly completed. However, there are still some broken concurrences reported in a separate thread. So I would not count either thread as "solved" until the second thread is addressed.

It's not a difficult fix for mojavenc (who maintains NV) to carry out.
« Last Edit: October 20, 2017, 08:03:05 pm by oscar »

Offline NickCPDX

  • TM Collaborator
  • Newbie
  • *****
  • Posts: 18
  • Last Login:January 29, 2024, 05:33:52 pm
Re: NV: I-580 bypass of Carson City now complete and open
« Reply #3 on: November 03, 2017, 05:00:34 pm »
Should be fixed

Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1524
  • Last Login:Today at 09:24:33 am
    • Hot Springs and Highways pages
Re: NV: I-580 bypass of Carson City now complete and open
« Reply #4 on: November 03, 2017, 05:36:37 pm »
Still need to synch US 395's US50_W waypoint with the corresponding waypoints for I-580, US 50, US 50BusCar, and US 395BusCar.

I made some other suggestions regarding that junction, which you could address while you're at it.


Offline oscar

  • TM Collaborator
  • TM Collaborator
  • Hero Member
  • *****
  • Posts: 1524
  • Last Login:Today at 09:24:33 am
    • Hot Springs and Highways pages
Re: NV: I-580 bypass of Carson City now complete and open
« Reply #5 on: November 19, 2017, 05:20:06 pm »
And there still is a broken concurrence between I-580 and US 50/395. The I-580 shaping point south of exit 38 doesn't match that for US 50 and US 395.

To un-break the concurrence, all waypoints along the I-580/US50/US395 concurrence, including shaping points, need to have identical coordinates. And all points at the I-580/US50/US395/US50Bus/US395Bus junction also need to have identical coordinates (the point in the US395 file doesn't have the same coordinates as the other four files).
« Last Edit: November 19, 2017, 06:33:47 pm by oscar »