Travel Mapping

Highway Data Discussion => 6-Month+ Highway Data Outlook => Topic started by: yakra on January 10, 2018, 02:33:31 pm

Title: Nova Scotia outlook / 5-Year Plans
Post by: yakra on January 10, 2018, 02:33:31 pm
 Five Year Plan  (http://www.gov.ns.ca/tran/highways/fiveyearplan.asp)  |  Highway Construction Projects  (http://www.gov.ns.ca/tran/highways/constructionprojects.asp)
Twinning (https://novascotia.ca/twinning/)  |  Final presentation.pdf (https://novascotia.ca/twinning/docs/Final%20presentation.pdf)  |  https://hwy104twinning.ca/

10-11 (https://www.novascotia.ca/tran/highways/5yearplan/Plan_2010-11.pdf) | 11-12 (https://novascotia.ca/tran/highways/5yearplan/Plan_2011-12.pdf) | 12-13 (https://novascotia.ca/tran/highways/5yearplan/Plan_2012-13.pdf) | 13-14 (https://novascotia.ca/tran/highways/5yearplan/Plan_2013-14.pdf) | 14-15 (https://novascotia.ca/tran/highways/5yearplan/Plan%202014_15.pdf) | 15-16 (https://novascotia.ca/tran/highways/5yearplan/Plan_2015_16.pdf) | 16-17 (https://novascotia.ca/tran/highways/5yearplan/Plan_2016_17.pdf) | 17-18 (https://novascotia.ca/tran/highways/5yearplan/Plan_2017_18.pdf) | 18-19 (https://novascotia.ca/tran/highways/5yearplan/highways-5-year-plan-2018-19.pdf) | 19-20 (https://novascotia.ca/tran/highways/5yearplan/highways-5-year-plan-2019-20.pdf)
20-21 (https://novascotia.ca/tran/highways/5yearplan/highways-5-year-plan-2020-21.pdf) | 21-22 (https://novascotia.ca/tran/highways/5yearplan/highways-5-year-plan-2021-22.pdf) | 22-23 (https://novascotia.ca/tran/highways/5yearplan/5-year-Highway-Capital-Plan-2022-2023.pdf) | 23-24 (https://novascotia.ca/tran/highways/5yearplan/highway-plan-2023-24.pdf)


2012-13:
Trunk 1; Granite Drive Roundabout (including a portion of the future Highway 101 Connector, New Minas

2016-17:
Highway 101/102 Interchange Structure & Ramp Modifications
(Last appears in 2012-13 plan. Has this been backburnered?)

2018-19:
Highway 101: Granite Dr Interchange and Connector (https://novascotia.ca/tran/highways/Highway101-granite-drive-interchange-connector.asp) (Fall 2018)
Highway 104: Taylor Road to Monastery - Paqtnkek Interchange

2019-20:
Highway 101: Digby to Marshalltown (https://novascotia.ca/tran/highways/Highway101-digby-to-marshalltown.asp) (October 2018) (End (https://www.digbycourier.ca/news/local/end-of-summer-eyed-for-completion-of-highway-101-new-four-kilometre-digby-marshalltown-corridor-295665/) of (https://www.novanewsnow.com/news/regional/end-of-summer-eyed-for-completion-of-highway-101-new-four-kilometre-digby-marshalltown-corridor-295665/) summer (https://www.pressreader.com/canada/tri-county-vanguard/20181121/281556586868526) 2019)

2020-21:
Highway 105: Route 252 Waycobah, access improvements

2021-22:
Highway 102: Lantz Interchange and Connector (Jan 2022 (https://thelaker.ca/lantz-interchange-still-on-target-for-jan-2022-opening-tir/))
Highway 103: Upper Tantallon to Ingramport Twinning
Summer 2022 (https://www.saltwire.com/nova-scotia/news/new-mira-gut-bridge-to-be-completed-in-2022-448300/): Mira Gut Truss Bridge: Route 255
Trunk 14: Intersection improvement at Route 215 in Newport (Petro Canada)
Trunk 28: Seaside Drive intersection improvements Trunk 28 and Gardiner Drive

2022-23:
Highway 104 / Route 344: Aulds Cove Intersection Realignment, access improvements
Highway 105/104: Port Hastings, rotary upgrades
Trunk 4: Trunk 4/16 Intersection improvements

2023-24:
Highway 102: Aerotech Connector
Highway 103 Twinning: Ingramport to Hubbards
Highway 103: Bridgewater Interchange (Exits 12-13)
Highway 107: Burnside to Bedford Phase 1 (https://novascotia.ca/tran/highways/hwy107.asp)
Summer 2024: Exit 28 (https://novascotia.ca/news/release/?id=20230831006)

2024-25:
Highway 104: Twinning: Sutherlands River - Barneys River Station
Highway 104 New alignment: Barneys River Station - Pushie Road
Highway 104: Twinning: Pushie Road - Antigonish

2025-26:
Highway 101: Three Mile Plains to Falmouth Twinning (Multiple Year Project)

2026-27:
Highway 103: Argyle Interchange (https://novascotia.ca/tran/highways/highway-103-argyle-interchange.pdf) (Multiple Year Project)

2027-28:
Highway 103 Twinning: Exit 6 to Exit 7 (Multiple Year Project)
Highway 103 Twinning: Exit 7 to 8 (Multiple Year Project)
Highway 104 Twinning: Taylors Road to Paqtnkek (Multiple Year Project)
Highway 107 Twinning: Burnside to Lake Loon (Multiple Year Project)
Title: Re: Nova Scotia outlook / 5-Year Plans
Post by: yakra on September 02, 2018, 02:28:20 am
Highway 101: Granite Dr Interchange and Connector (https://novascotia.ca/tran/highways/Highway101-granite-drive-interchange-connector.asp) (Fall 2018)
"should be open to the motoring public sometime this fall."
http://www.kingscountynews.ca/news/local/work-on-new-minas-granite-drive-highway-101-interchange-on-schedule-and-on-budget-235412/