Recent Posts

Pages: [1] 2 3 ... 10
1
Updates to Highway Data / Re: IA: US6
« Last post by Jeff Morrison on Today at 02:14:11 am »
US 6 is fully signed (well, side-pole-signed) on I-29 and I-80 and the routing is reflected in the HB so this should be closed.
2
Updates to Highway Data / Re: MS I-20/55 multiplex
« Last post by Jeff Morrison on Today at 02:12:53 am »
This issue remains unchanged and unfixed.
3
I can add the point to MO 94.

IIRC, the guideline was that a non-interstate with exit numbers should still use street names instead of numbers except maybe some with special circumstances. I see that 364 is now a fully-controlled-access route, but it's still a state route.
4
Updates to Highway Data / Re: SD: I-190/US 16 complete overhaul
« Last post by Jeff Morrison on Today at 02:04:27 am »
Given the short length of the route, I don't know if changing the current style to exit numbers really helps. The I-90 exit is really 1A and 1B, so renaming it to 1A would omit 1B. And it shouldn't be "1" because of the 1C.

GMSV shows that Exit 1C is signed as North Street so I should change that.

It looks like an on-ramp from the former Anamosa Street exit remains so perhaps I should star it, i.e. not mark as closed. But it doesn't have its own exit number, so it would remain with a name instead of a number. That's an argument for keeping the whole set as it is.

IMO, the way to go here is to change SilSt to NorSt and leave everything else as is.
5
Updates to Highway Data / Re: QC: A-25 northern end
« Last post by yakra on Today at 12:35:39 am »
Ah! So an end at QC125_N/QC158_E would also be not inconsistent with the shapefiles! 8)
6
Solved Highway data updates / Re: NJ:I-78 NJTP Extension Exit Numbers
« Last post by yakra on Today at 12:18:20 am »
Yes, looks like I just forgot to mark this as solved. Doing so now.
7
The extensions/reroutes are mostly completed. However, there are still some broken concurrences reported in a separate thread. So I would not count either thread as "solved" until the second thread is addressed.

It's not a difficult fix for mojavenc (who maintains NV) to carry out.
8
I saw commits to these files but I'm not sure if all issues mentioned are fixed. @oscar: Can the topic be marked solved?
9
Solved Highway data updates / Re: NJ:I-78 NJTP Extension Exit Numbers
« Last post by michih on Yesterday at 03:40:59 pm »
Are all mentioned issues solved?
10
Solved Highway data updates / Re: KY: I-66FutBow
« Last post by michih on Yesterday at 03:31:50 pm »
Ok, I'll add the ? message icon indicating "wait for info"...
Pages: [1] 2 3 ... 10